THE CONSTRUCTION OF SAUGDADDYS

SaugDaddys Dock started construction in January of 2024 and was fully built out by July. This is the story in pictures of how it was done

Aluminum pilings and decking installed. Pilings pounded down until point of refusal reached

Aluminum roof and dockhouse installed. Physical dock now complete

6 ton dual motor boat lift being installed. Camera boat weighs 8,700 lbs without fuel

Shore side wall installed to protect bar top and appliances

B&B staff installing electrical for fans, lights and power outlets

Granite countertops and sink installed. Bar top is black walnut from Everheart in Tellico Plains